How many days must pass before a Notice of Termination form is sent to terminate construction permits after conditions are met?

Prepare for the Virginia DEQ SWM Inspector Test with our comprehensive study material. Delve into multiple-choice questions and gain access to valuable hints and explanations. Stay ahead in your exam preparations with confidence!

The requirement for submitting a Notice of Termination (NOT) form to terminate construction permits after all conditions are met is set to 30 days. This timeframe ensures that all necessary inspections and evaluations have been completed and that any final compliance measures are addressed before formally concluding the permit. This duration allows sufficient time for the reviewing authorities to assess the project’s adherence to the environmental standards and to ensure that the site’s stormwater management practices are effectively maintained. Thus, 30 days provides a balance between efficient permit closure and thorough verification of compliance with all regulations.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy