Which two plans in the SWPPP must be approved?

Prepare for the Virginia DEQ SWM Inspector Test with our comprehensive study material. Delve into multiple-choice questions and gain access to valuable hints and explanations. Stay ahead in your exam preparations with confidence!

In the context of the Storm Water Pollution Prevention Plan (SWPPP) as outlined by the Virginia DEQ, the requirement for specific plans to be approved is crucial for ensuring compliance with state regulations. The SWM (Stormwater Management) and ESC (Erosion and Sediment Control) plans are essential components designed to mitigate the adverse effects of stormwater and erosion during land disturbance activities.

The Stormwater Management Plan is focused on how to manage the quantity and quality of stormwater runoff from the project site, reducing pollutants that can enter local waterways. Meanwhile, the Erosion and Sediment Control Plan addresses practices and measures implemented to minimize soil erosion and manage sediment during construction.

Both of these plans must be approved by the appropriate regulatory authority to confirm that they meet the necessary standards and regulations for protecting the environment during construction activities. This approval process is vital as it ensures that the plans are both practical and compliant with local and state policies aimed at conserving water quality and preventing erosion.

Other plans, such as the NPDES (National Pollutant Discharge Elimination System) and the maintenance and inspection plans, while important, do not require the same level of specific approval under the SWPPP framework as the SWM and ESC plans do. Additionally,